Project scope consists of roadway paving, storm sewer repairs, new water main and parkway restoration. The project improvements include:

· All new asphalt pavement
· Storm sewer repairs
· Water main replacement and upsizing with new homeowner water services
· Driveway apron repairs and replacement
. Parkway sod restoration

Project Timeline
May 2013 – Start of Construction
August 2013 – End of Construction

Friday, June 28, 2013

Water Services South of East Lake Avenue Continue

This past week the contractor performed testing on the newly installed water main along Longmeadow Drive between Crestwood Lane and East Lake Avenue. The contractor also continued to install new water services to individual homes along Longmeadow Drive between Knollwood Lane and Crestwood Lane and performed various storm sewer work along Longmeadow Drive between Knollwood Lane and East Lake Avenue. All water services along Longmeadow Drive from Glenview Road to Crestwood Lane have been transferred to the new water main. The contractor did not perform any directional drilling this week in an effort to get caught up with some of the other work associated with the project. 

Next week the contractor will directional drill new water main along Ralmark Lane from Longmeadow Drive to the cul-de-sac.  Water services along Longmeadow Drive from Crestwood Lane to East Lake Avenue will also begin. The contractor is also anticipating making the connection between the new and existing water mains at the intersection of Knollwood Lane and Longmeadow Drive, a water shut down will be required for this work. Residents will be notified 24-hours in advance of any water main shut down.

The contractor will not be working on Thursday, July 4th and is not anticipating performing any work on-site on Friday July 5th.

During water service installation and connection to the existing service, water to individual homes will be shut off for a short period of time. The contractor will knock on the door of any home that will not have water prior to turning it off.

Thank you for your patience during the construction operations.

Friday, June 21, 2013

Water Services and Water Main Work Continues

This past week the contractor completed directional drilling the new water main along Bellwood Drive from Executive Lane to Ralmark Lane. The contractor continued to install new water services to individual homes along Longmeadow Drive between Glenview Road and Crestwood Lane.

Next week the contractor will complete testing on the newly installed water main along Longmeadow Drive from Crestwood Lane to East Lake Avenue. Water services will continue to be installed along Longmeadow Drive between Knollwood Lane and Crestwood Lane. Water main will be directionally drilled along Ralmark Lane from Longmeadow Drive to Bellwood Lane. The contractor may also begin installing fire hydrants and water valves on the previously installed water main north of East Lake Avenue.

During water service installation and connection to the existing service, water to individual homes will be shut off for a short period of time. The contractor will knock on the door of any home that will not have water prior to turning it off.

Thank you for your patience during the construction operations.

Friday, June 14, 2013

Water Services Continue

This past week the contractor completed directional drilling the new water main along Longmeadow Drive north of East Lake Avenue and began directional drilling along Bellwood Lane from Longmeadow Drive to Ralmark Lane. The contractor also performed the required water main testing for the newly installed water main along Longmeadow Drive between Glenview Road and Crestwood Lane. The contractor began installing new water services to individual homes along Longmeadow Drive between Glenview Road and Knollwood Lane. The contractor did make the connection to the existing water main along the south side of East Lake Avenue at Longmeadow Drive.

Next week the contractor will complete testing on the newly installed water main along Longmeadow Drive from Crestwood Lane to East Lake Avenue. Water services will continue to be installed along Longmeadow Drive between Glenview Road and Crestwood Lane. Water main will continue to be directionally drilled along Bellwood Lane from Executive Court to Longmeadow Drive and along the southerly section of Ralmark Lane from Longmeadow Drive.

During water service installation and connection to the existing service, water to individual homes will be shut off for a short period of time. The contractor will knock on the door of any home that will not have water prior to turning it off.

Thank you for your patience during the construction operations.

Friday, June 7, 2013

Water Services South of East Lake Avenue to Begin

This past week the contractor completed directional drilling the new water main along Longmeadow Drive south of East Lake Avenue and began directional drilling along Longmeadow Drive north of East Lake Avenue. The contractor also installed water valve vaults and fire hydrants along the newly installed main.  The contractor installed storm sewer at the intersection of Longmeadow Drive and Crestwood Lane.

Next week the contractor will complete testing on the newly installed water main along Longmeadow Drive from Crestwood Lane to Glenview Road and continue to directionally drill water main along Longmeadow Drive and Bellwood Lane north of East Lake Avenue.

The contractor will also connect the new water main to the existing water main on the north end of Longmeadow Drive, just south of East Lake Avenue. A water main shut down will be required for this work. Residents effected by the shut-down will be notified.

Next week the contractor will begin installing new water services to individual homes along Longmeadow Drive south of East Lake Avenue from Glenview Road to the north.

During water service installation and connection to the existing service, water to individual homes will be shut off for a short period of time. The contractor will knock on the door of any home that will not have water prior to turning it off.

Thank you for your patience during the construction operations.