Project scope consists of roadway paving, storm sewer repairs, new water main and parkway restoration. The project improvements include:

· All new asphalt pavement
· Storm sewer repairs
· Water main replacement and upsizing with new homeowner water services
· Driveway apron repairs and replacement
. Parkway sod restoration

Project Timeline
May 2013 – Start of Construction
August 2013 – End of Construction

Friday, May 24, 2013

Water Main Directional Drilling On-Going

This past week the contractor continued to directional drill new water main along Longmeadow Drive south of East Lake Avenue. The contractor also made the connection to the existing water main at Glenview Road along with installing valve vaults and fire hydrants in the areas the water main was previously installed.

Next week the contractor will continue to directional drill new water main along Longmeadow Drive south of East Lake Avenue.  The contractor will continue installing water valve vaults and fire hydrants on the newly installed water main.

As you are likely aware, during construction operations sometimes unexpected events occur, specifically hitting or breaking an existing water main. If this should occur, the existing water main needs to be shut down immediately and repaired. We will do our best to notify each resident prior to completing turning off the water, but we ask for your understanding and patience during these times.

Residents will be given a 24-hour notice for any scheduled water main shut-downs.

Thank you for your patience during the construction operations.