Project scope consists of roadway paving, storm sewer repairs, new water main and parkway restoration. The project improvements include:

· All new asphalt pavement
· Storm sewer repairs
· Water main replacement and upsizing with new homeowner water services
· Driveway apron repairs and replacement
. Parkway sod restoration

Project Timeline
May 2013 – Start of Construction
August 2013 – End of Construction

Friday, June 14, 2013

Water Services Continue

This past week the contractor completed directional drilling the new water main along Longmeadow Drive north of East Lake Avenue and began directional drilling along Bellwood Lane from Longmeadow Drive to Ralmark Lane. The contractor also performed the required water main testing for the newly installed water main along Longmeadow Drive between Glenview Road and Crestwood Lane. The contractor began installing new water services to individual homes along Longmeadow Drive between Glenview Road and Knollwood Lane. The contractor did make the connection to the existing water main along the south side of East Lake Avenue at Longmeadow Drive.

Next week the contractor will complete testing on the newly installed water main along Longmeadow Drive from Crestwood Lane to East Lake Avenue. Water services will continue to be installed along Longmeadow Drive between Glenview Road and Crestwood Lane. Water main will continue to be directionally drilled along Bellwood Lane from Executive Court to Longmeadow Drive and along the southerly section of Ralmark Lane from Longmeadow Drive.

During water service installation and connection to the existing service, water to individual homes will be shut off for a short period of time. The contractor will knock on the door of any home that will not have water prior to turning it off.

Thank you for your patience during the construction operations.